The rock under your
feet is already the answer.

OPUS SCM™ is manufactured from a virtually inexhaustible natural resource.

01 — Raw materials

It starts with silicate 
rock—the most abundant rock on Earth.

Silicate rock doesn’t release CO₂ when processed. Limestone does—and that’s what causes nearly half of Portland cement emissions.

Abundant

Silicate rocks are found in 90% of the Earth’s crust—more abundant than limestone. Supply is never the constraint, regardless of market or geography.

Economical

Feedstock comes from existing, permitted operations—often low-value products or waste streams. In many cases, it’s material our partners already own and control.

Local

Terra’s plants are built adjacent to existing aggregate mine sites, close to the markets they serve. No new mines need to be permitted. No long-haul transport is required.

Versatile

Terra’s process works across a wide range of silicate rock mineralogy. We adapt to the materials available in your market—not the other way around.

The material difference

Tested feedstocks

GRANITE

GRANODIOTIRE

BASALT

sand

ALLUVIAL SAND & GRAVEL

gravel

GLACIAL GRAVEL

pyro

PYROCLASTIC ROCK

slate

SHALE & SLATE

IMPURE CLAY

MINE TAILINGS

GRANITE

TYPE

Major continental rock

LOCATION

Continental shields and batholiths

GRANODIORITE

TYPE

Major continental rock

LOCATION

Batholiths, continental arcs, mountain belts

BASALT

TYPE

Major volcanic rock

LOCATION

Flood basalts, volcanic islands, rift zones, oceanic crust

ALLUVIAL SAND & GRAVEL

TYPE

Unconsolidated sedimentary aggregate

LOCATION

River channels, floodplains, alluvial fans, terraces

GLACIAL GRAVEL

TYPE

Unconsolidated glacial sediment

LOCATION

Recently glaciated regions of the global North

PYROCLASTIC ROCK

TYPE

Volcano-derived deposits

LOCATION

Volcanic cones, ash and tephra deposits

SHALE & SLATE

TYPE

Fine-grained sedimentary/metamorphic rock

LOCATION

Sedimentary basins, former marine/lake deposits, low-grade metamorphic belts

IMPURE CLAY

TYPE

Clay-rich sediment with quartz, carbonate, and others

LOCATION

Weathered soils, sedimentary basins, floodplains, coastal plains

MINE TAILINGS

TYPE

Processed waste rock/mineral residue

LOCATION

Tailings ponds, mine waste facilities, abandoned or active mining districts

02 — The process

OPUS SCM™: from feedstock to final product 

Terra’s process is proprietary, patent-protected, and designed from the ground up to be scalable, replicable, and deployable to any major market.

Milling

Raw silicate feedstock is milled to the required particle size at or near the source—minimizing transport distance and cost from the first step.

Vitrification

Terra’s proprietary, patent-protected reactor vitrifies the milled feedstock into a glassy, amorphous powder with the reactive properties required for use as an SCM. Engineered to minimize energy consumption.

Quality control

Finished OPUS SCM™ is tested against ASTM specifications by independent, accredited laboratories. Chemical composition, physical properties, and concrete performance—all verified before the product ships.

ASTM Class N certified

Certified to industry standard

Higher long-term strength

Continues to gain beyond 28 days

Third-party verified

testing conducted by accredited labs

Tested across 95% of all silicate rock types

Consistent performance from granite to mine tailings

Familiar set and finish

Handles SIMILAR TO standard fly ash mix

Integration

OPUS SCM™ drops directly into existing concrete production infrastructure. No new equipment. No changes to batching, delivery, or placement. Fully drop-in compatible.

OPUS SCM

Portland CEMENT

Water

Sand

GRAVEL

THE RESULT

Tested and proven. Building now.

Outperforming legacy SCMs

OPUS SCM™ matches—and in several key metrics exceeds—the performance of fly ash and other legacy SCMs. The product is already in use on active build sites.

03 — Built to scale

A proven model.
Ready to replicate.

Terra’s advanced processing facility is standardized and replicable—a proven model that can be built in 12–14 months on a footprint of approximately 5–10 acres, adjacent to existing industrial and mine sites.

Local production, lower impact

Plants are built close to market and feedstock, cutting costs and complexity. The first commercial plant is underway in Texas, with six more sites nearing shovel-ready status.

5-10 acres

A small-footprint plant,
industrial-scale output

2027

Open for business,
Dallas-Fort Worth market

240k

Tons of OPUS SCM™
produced annually

GET IN EARLY

Want to know if your feedstock will work with Terra’s process?

We want to hear from you.

Whether you want to source OPUS SCM™ or explore owning a manufacturing facility in your market, it starts with a conversation.